Latest school project: four star hotel in a not that nice area of Bucharest.
Does what it says on the tin.
What’s nice is that there are a lot of embedded parametrics inside: the canopy structural system, terrain modding (site), shape cracking of the canopy. Sometime ago there even was a def for controlling room sizes in respect with planar geometries.
Floor plan:
Second and third floor plans:
UPDATE:
Here are some pictures of the final model i built:
Hope you’ll like and love.













4*HTL Plevnei « un didi
[...] out. More info on the project here. « Urban [...]
Jan 24, 2010 @ 12:55 pm
drr
bravooo
Jan 26, 2010 @ 5:10 am
Didi
dadadada!
Jan 27, 2010 @ 5:30 pm